Drainage pipes laying
For a correct and effective laying of a slotted piping it is necessary to act according to following indications:
| - |
cover the trench walls with a layer of disposable fabric; |
| - |
realize a trench-bed with selected material (fine gravel with granulometry 3-5 mm) for a bed thickness of 10 cm, to avoid the direct resting of the corrugations on the deepest level of the digged trench; |
| - |
fill the trench around the pipe walls till 40 cm over the top of the pipe, with selected material (fine gravel with granulometry 3-5 mm); then close the two strips of disposable fabric over this covering level; |
| - |
ultimate the backfilling of trench using the same ground digged at the beginning. |

It is important to effect a good compaction with special machines and to do not pass during the laying works over the trench area with excavator machines or any other heavy machines or vehicles.
|
 |
|
|